
1. CHECK WALL
Using a stud finder, check walls for pipes, wires or timber uprights.
|

2. DRILL WALL
Having used the grab rail as a guide, drill holes for screws, (or supplied wallplugs if solid wall).
|

3. FIT GRAB RAIL
Fit grab rail onto wall. Use screws supplied where practical. (Use supplied wallplugs if solid wall).
|

4. SCREW STOOL TO FLOOR
Align bath lift parallel to the grab rail, adjust the height, drill & screw the feet to the floor.
|

5. ADJUST TENSION
Wind excess belt around the rail bar and slot into the grab rail cradles.
|
6. Test the complete bath lift installation for security before use.
|